I am preparing Triangulated Irregular Network for large area (5000 Sq Km) in ArcGIS, The TIN models takes too much time to open in ArcMap, and if I move or change anything again its starts to rendering, It takes too much time to do small changes, how to stop the rendering, and how to keep it in Builded TIN in ArcMap.
Number of Nodes in TIN is 3633846 Number of Triangles is 7267645
it takes three minutes to open fully.