In QGIS 3.26.1, I used the QNEAT3 "OD Matrix from Layers as Table (m:n)" function. (Ancillary info: I am using the TIGER/Line 2019 primary and secondary road data for the US, in order to calculate fastest routes from each county centroid to each county centroid.) As optimization criterion I set fastest path. I also set the default speed to 88 km/h. Otherwise, the parameters for the function are the default settings.
After the calculation finishes, I receive values between 0 and 2. However, upon reading a similar Q&A at Interpreting total cost variable in QNEAT 3 OD Matrix using QGIS I am expecting the results to be reported in terms of seconds traveled between points in the layers. Given that I am looking for county to county road travel times, the results don't seem to make sense to me. The only way to potentially make sense of the results is if they were reported in days, rather than seconds.
How can I make sense of the results that I get?
Are they really reported in seconds, as stated in the above thread?
Did something go wrong with how I am using the algorithm or my input data?